A customer has two Power 570 servers that need to be replaced to accommodate company growth.
The first server runs a transactional workload with high server usage during the day (8am-8pm)
The second server runs analytic queries based on the transactional data during the night (10pm-6am).
A technical sizing analysis determined that each server would require (18) POWERS 3.52GHz cores and
160GB RAM, considering the needed growth.
What would be the most cost-efficient way to satisfy the customer needs?
A. (1) new Power S824 with 24 cores and 384GB and DLPAR CPU resources among LPARs
B. (1) new Power 770 with 36 active cores and 384GB active, virtualized with capped LPARs
C. (1) new Power S824 with 36 cores and 384GB, virtualized with capped LPARs.
D. (2) new Power S824 with 20 cores and 192GB RAM each.
A customer needs faster response time from their database server and is considering purchasing POWERS. They are familiar with Easy Tier, and have heard that they can use it locally on some servers.
Which feature(s) would enable this function?
A. Enhanced backplane (EJOP)
B. Standard backplane (EJON)
C. Enhanced backplane (EJOP) with the Split backplane feature (EJOS)
D. Standard backplane (EJON) with optional SSD cage (EJTM)
Which components of PowerKVM provide I / O virtualization ?
A. IPMI
B. virsh
C. QEMU
D. Kimchi
Which technology provides virtual machine dedicated virtual resources, improve QoS, remove the I / O virtualization load ?
A. PowerVM
B. CNA ( converged network adapters )
C. FCoE ( Fiber Ethernet protocol run )
D. SR-IOV ( single point of management I / O virtualization )
Dynamic partition migration , the following is required ?
A. PowerVM Enterprise Edition SAN disk system Virtual Ethernet
B. dedicated processor PowerVM Enterprise Edition Virtual Ethernet
C. dual VIO server PowerVM Enterprise Edition SAN attached disk Two virtual processors
D. dedicated processor Dual VIO server SAN disk system Virtual Ethernet
Customers expect their virtual environment network and storage I / O traffic will be very large . They are interested in the I / O load separation. They also hope to be in the case of the VIO server without downtime for maintenance.
Which option to meet the requirements ?
A. (2) VIO servers , each handling a part of the flow
B. (4) VIO servers , each handling a part of the flow
C. (4) VIO server , wherein two processing network , handling two storage
D. (2) VIO server , wherein a processing network, a processing memory
Which of the following are required in order to utilize Live Partition Mobility?
A. Dedicated processors PowerVM Enterprise Edition Virtual Ethernet
B. Dual VIO Servers PowerVM Enterprise Edition SAN attached disk two virtual processors
C. PowerVM Enterprise Edition SAN attached disk Virtual Ethernet
D. Dedicated processors Dual VIO Servers SAN attached disk Virtual Ethernet
A customer will be purchasing a POWER8 Scale-out server, and will be launching a heavy database application.
Which operating system is unified with a database?
A. AIX
B. IBM i
C. Windows
D. Linux
A client would like to user Power servers to reliably manage large volumes of structured and unstructured Hadoop open source framework. data using the
Which IBM offering will satisfy their requirement?
A. IBM Infosphere Master Data Management
B. IBM InfosphereBigInsights
C. IBM Infosphere Streams
D. IBM Infosphere Clinical Analytics
A customer will purchase an SB24 server to replace a Power 520 with IBM I V5R4. Middleware integration and securing business critical data is important to the customer.
What will allow the customer to support all of the requirements?
A. Trusted Firewall and Trusted Surveyor
B. DB2 Row and Column Access Control
C. PowerSC
D. Tivoli Directory Server