Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
A. When multiple operations are maintained for one product
B. When alternate resources are used within one operation
C. When multiple planned orders exist on one resource
D. When multiple production versions are maintained for one product
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA? (Choose 2)
A. First in first out (FIFO)
B. 100% check
C. Simultaneous
D. By usage probability
Which information is required when you created a production master in SAP S/4HANA? (Choose 2)
A. Selective screen for views
B. Product type
C. Base unit of measure
D. Industry sector
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing? (Choose 3)
A. Posting of production costs to the production cost collector
B. Material staging for nex order in sequence
C. Archiving of documents for assembly scrap
D. Posting of goods receipt for the product
E. Reduction of associated capacity requirements
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
A. MRP group
B. Plants parameters
C. MRP controller
D. MRP profile
What does it mean for the production planner when MRP works with infinite capacities?
A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
B. MRP creates capacity requirements without checking the capacity of a work center.
C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
D. MRP creates capacity requirements only if the work center has sufficient capacity.
What is the difference between co-products and by-products?
A. Only co-products appear in the process or production order settlement rule.
B. Only co-products can be manufactured in isolation from the main product.
C. Only co-products are identified by a special item category in the bill of material (BOM).
D. Only by-products have a zero inventory valuation.
In the Schedule Production app which setting can you make for the planning strategy?
A. Fitness level
B. Scheduling control
C. Fixed pegging
D. Direction
E. Planning mode
For a production version to be valid and consistent what requirements must be fulfilled? (Choose 3)
A. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
B. The assigned routing must NOT have alternative sequences.
C. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
D. The lot size range must be within the lot-size range of the assigned routing.
E. The assigned routing must be a rate routing.
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
A. Material requirements planning
B. Manual planning without check
C. Forecast planning
D. Consumption-based planning