Quality is an attribute of:
A. A Product
B. A Service
C. A Process
D. All of the above
E. None of the above
Quality Management is defined as an approach which uses decisions based on:
A. Budget, Schedule, Information
B. Logic, Facts, Schedule
C. Facts, Data, Logic
D. None of the above
Entity Relationship Diagrams identify:
A. Trace the movement of information through a process
B. How and when transformations occur
C. Define all of the components of a specific activity
D. Who and what are involved in a process and how they interact
Measuring the results of most Business Requirements are generally:
A. Analogue (a range of acceptable values)
B. Binary (on or off, present or not)
C. Either Analogue or Binary
D. None of the above
The attributes of a good requirement include:
A. Traceable
B. Correct
C. Complete
D. Unambiguous
E. All of the above
During what type of review would an examination of a specific project be done to determine what worked, what did not work and what should be changed for the future.
A. Checkpoint Review
B. Post Implementation Review
C. Phase End Review
D. None of the above
The following are different causes of defects, EXCEPT:
A. Ambiguous Requirements
B. Poor Design
C. Incorrect Translation of the Design into Code
D. Signed Off Requirements
A program validates a numeric field as follows:
Values less than 100 are rejected, values between 100 and 200 are accepted, values greater than or
equal to 201 are rejected.
Which of the following input values cover all of the equivalence partitions?
A. 100, 110, 199
B. 3, 200, 210
C. 80, 100, 201
D. 100, 200,201
The Project Liaison is the primary project contact with the other party or parties to the contract.
A. True
B. False