Find the value of (6) in the ANOVA table. Assume:
A. 16.4
B. 3.2
C. 18.6
D. 23.2
E. 4.54
F. 12.2
G. 0.525
H. 2.82
I. 1.48
J. 35.4
K. 0.10
L. 0.05
M. 0.01
N. 0.005
O. 0
Calculate the Rolled Throughput Yield of this process using this data. Data. unit input: 1450, unit output: 1390, defects repaired. 320, scrap: 60
A. 71.33%
B. 72.66%
C. 73.79%
D. 77.93%
A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________.
A. Value Stream Map
B. FMEA
C. Pareto Chart
D. Standard Operating Procedure
Data that can be measured on a continuum and has meaningful decimal subdivisions are __________ data.
A. Continuous
B. Surplus
C. Discrete
D. Variable
The English words used for the 5S's are __________, _____________, Shining, Standardizing and Sustaining. (Note: There are 2 correct answers).
A. Shaping
B. Sorting
C. Shifting
D. Straightening
Which of these graphical presentations displays the values of each individual reading?
A. Histogram
B. Box Plot
C. Stem and Leaf Plot
D. X-Y Diagram
Which statement is NOT correct about the Fitted Line Plot shown here?
A. The independent variable is the reactant
B. If the reactant was 6 units, with 95 % confidence we would expect a minimum yield of 100 units
C. With at least 95% confidence, we can expect less than 10 units of Yield when the reactant is at a value of 1
D. A reactant value between 2 and 4 units yields around 20 to 40
E. When the reactant increases, the expected yield would increase
Lean Enterprise is based on the premise that anywhere work is being done which of these is also occurring?
A. Money is being spent
B. Waste is being generated
C. Waste is being calculated
D. Waste is being eliminated
In the late 1980's ______________ coined the name Six Sigma for a methodology that had its origins at Motorola for quality related work being done there.
A. Joseph Juran
B. William Smith
C. Mikel Harry
D. Bill Lary
In order for a problem to be solved correctly, which of the following must occur first?
A. The problem must be defined
B. Relevant data must be gathered
C. The measurement system must be validated
D. The process must be mapped