In the HP ALM Business Models module, how are path entities created?
A. By selecting from a list of possible business process paths
B. By dragging/dropping the desired alternate flows under the corresponding model entity in the Model Tree view
C. Automatically, when importing a business process model into ALM
D. By drawing arrows that link the hotspots available on the activities on the interactive Entities Pane
How should you leverage Test Configurations to cover multiple Requirements and avoid duplications?
A. By associating the same Test Configuration in multiple Tests with each Requirement
B. By associating different Test Configurations in multiple Tests with each Requirement
C. By associating different Test Configurations in the same Test with each Requirement
D. By associating the same Test Configuration in the same Test with each Requirement
What happens if you link a defect to a run? (Select two)
A. The defect is indirectly linked to the run's steps because the run steps are lower-level.
B. The defect is directly linked to the run and indirectly linked to the run's test instance, the test set, and the test.
C. The defect is indirectly linked to the test instance and to the test set, but not to the test, because the link to the test instance prevails.
D. The defect is indirectly linked to the test instance only, as indirect links only propagate to the nearest entity.
E. If the corresponding test is covered by a requirement, an indirect link is also added to the requirement.
What can you use to create a printable report?
A. Document Manager
B. Hypertext Generator
C. Project Reports
D. Backup Manager
In the HP ALM Synchronizer Links grid. Automode indicates whether the synchronization link is in automatic mode.
How does the Automode value affect the link behavior?
A. If the field has value True, the link is in automatic mode and will run automatically affixed time intervals (10 minutes).
B. If the field has value False, the link will run only if you manually instruct it to do so
C. If the field has value True, the link is in automatic mode and will run in full synchronization mode only, until you disable.
D. If the field has value True, the link is in automatic mode and will run automatically at time intervals you specified in me Scheduling tab.
E. If the field has value False, the link will run automatically at fixed time intervals (10 minutes) and will disregard the time intervals you specified in the Scheduling tab.
How is version control enabled for a project?
A. In Site Administration, by using the versioning toggle control
B. In Site Administration, by checking Enable Version Control only at project creation time
C. In Project Customization, by using the versioning toggle control
D. In Site Administration, by using the Site Configuration parameters
Which documentation articles show the supported operating systems? (Select two.)
A. The administrator guide
B. The Supported Environments page
C. The installation and upgrade guide
D. The Product Availability Matrix (PAM)
E. The user guide
In which module can a requirement be converted to a test?
A. Requirements
B. Test Plan
C. Defects
D. Management
What should you do to make a new field mandatory when the test status changes to Ready?
A. Set configuration options for the new field via Customize > Workflow > Script Generator- Test Details Field Customization.
B. Modify the code of the appropriate event function in Customize > Workflow > Script Editor.
C. Set configuration options for the new field via Customize > Project Entities > Test > User Fields.
D. Create a custom event function in Customize > Project Entities > Test > User Fields.
In the Execution Flow diagram area, the dependency between two tests can be indicated by a green line arrow.
How is the dependent test executed?
A. Only if the controlling test finishes and passes its execution
B. Sequentially, with no conditions
C. Only if the controlling test finishes independent of the execution status
D. After a specified time interval, with no additional conditions